Technical Information

Image Credits

Key data

Administration: Cornelia Dohr, Susanne Dohr, Michaela Possanner

Architectural team Dietmar Ott (project manager), Niels Jonkhans (design architect), Gernot Stangl, Sigrid Brell-Cokcan (3D-engineering), Gerhard Eder (technical coordination), Werner Riedl (construction supervisor)

Architects Johanna Digruber, Daniela Fritz, Herbert Hazmuka, Hans Kaponig, Eduard Kölbl, Peter Löcker, Florian Lohberger, Ernst Plank, Herwig Stern, Bernd Priesching, Christian Probst

Artistic director Peter Pakesch until 09/2015, Barbara Steiner until 12/2021, Andreja Hribernik since 01/2023

BIX electronic display skin Realities:United, Berlin

Building research Markus Zechner, Graz

Building services HL-Technik, TB Pickl, TB Köstenbauer and Sixl, lighting Kress and Adams, Cologne

Client City of Graz Kunsthaus Graz AG, Griesgasse 11, A-8020 Graz

Construction coordination Robert Gobli

Competition design Peter Cook, Colin Fournier with Niels Jonkhans, Mathis Osterhag, Marcos Cruz, Nicola Haines, Karim Hamza, Anja Leonhäuser, Jamie Norden
Competition April 2000, start of construction 12.7.2001

Designers spacelab cook/fournier (Peter Cook, Colin Fournier)

Exhibition space 2,500 m2 (incl. 250 m2 event space, event space 280 m2 Camera Austria exhibition)

Financing Federal Government, Province, City

Fire protection officer Gerhard Düh, Vienna, construction physics Dr. Pfeiler GmbH, Graz

Gross floor area 13,100 m2 (incl. underground car park)

Lessor Bank Austria Leasing GmbH, Opernring 21, A-1040 Vienna

Number of acrylic glass panels outside 1068, size up to 2m x 3m, 20mm thick, each individually three-dimensionally shaped, held by approx. 6000 individual hinged holding points

Number of acrylic glass panels inside 185 (size up to 2m x 3m, 8mm thick, each individually three-dimensionally shaped, held by approx. 1500 individual hinged holding points)

Number of Nozzles 16 (1 Nozzle is used for smoke extraction, 1 serves as a view of the Graz landmark, the clock tower, 14 Nozzles are used for daylight and artificial light supply on the upper exhibition level)

Partners Architect Architektur Consult, Graz (Peyker, Domenig, Eisenköck), Structural Engineer Bollinger und Grohmann, Frankfurt/M

Planning, general planning ARGE Kunsthaus

Project management Kunsthaus Graz AG/Hochbauamt Stadt Graz (Ernst Pogöschnik, Andreas Blass, Josef Spindler)

Project management Hans Lechner GmbH, Vienna (Hans Lechner, Sabine Liebenau)

Start of construction, laying of foundation stone 28.2.2002, completion 27.9.2003 (opening)

Soil mechanics Reinhard Pötscher, Graz, Surveying Rinner

Traffic planning Kaufmann-Kriebernegg, Graz, museology Bogner Cultural Consulting, Vienna

User Landesmuseum Joanneum GmbH, Raubergasse 10, A-8010 Graz

Useful area 11,100 m2

Underground parking 146 cars (company: Kastner und Öhler)

Weight of the Bubble 3.9 million kg, of which steel construction 225,000 kg